Construction

Our construction department specializes in maximum prefabrication. This can be done thanks to the fully-drawn 3D modelling. As a result, during the construction or alteration of an installation, we spend as little time as possible on-site, with minimal disruption of our customer's activities.

We make the necessary work preparation drawings and parts lists based on the 3D model, which form the basis of the work of our craftsmen. Welding and grinding are done as little as possible on site. It goes without saying that we strictly follow the safety guidelines of our customers. CEE is VCA certified.


After the mechanical construction of the plant on site, the electricians do the cabling and the isolators takes care of thermal insulation. This completes the installation, ready for inspection for commissioning and start-up.


Check out our references or send us an email if you have any questions.